Preliminary analysis on the preparation of the slip conductor

Slip the guide rail into the connector 1/2, more than 1/2 to be used with another rail connection, after the work is ready, in the sliding wire one by one of the suspension on the bracket, for full connection, the connection to tighten the screws of each connector. When the length of the slide conductor is more than 200 meters, it should be appropriate to add the Slip Line expansion section, when the connection line into the line, can be in every 6 meters or 4.1-meter joints at the junction. In the installation of curved-arc sliding contact line, the installation distance of the suspension frame should be shortened correspondingly, the specific size can be determined according to the field conditions.

The installation and maintenance of the slip conductor, when installing the slip-wire collector, the set of electrical apparatus is installed on the supporting square tube. Select the appropriate position with the slip conductor fixed on the electric equipment, should pay attention to make the slip wire collector and the slip conductor have good tracking performance and good contact pressure, the collector and the slip conductor to install in the same vertical, horizontal direction.

Before transmission, to a full line of review, especially the power supply connector, to confirm that it is not loose, after the installation is completed correctly, according to the commissioning personnel into the operating position, and then power.

Turn on the power, observe the power of the mobile device after normal, start the small power of the mobile device to run for a few minutes, and then start high-power mobile device operation. Observe the set of electrical appliances in the whole line relative to the slide of the left and right pendulum, if the deflection is too large, the slide line can be adjusted again. Observation of the electrical collector carbon Brush in the slip-line connection sliding state, if the run is not smooth and bad contact, should be the sliding line interface to reload, or increase the slide line end of stainless steel chamfer after reloading, adjust to the appropriate position.